Home  |  News  |  Forums  |  FAQ  |  Classifieds  |  Events  |  914 Info  |  Blog  |  Members Map
IPB
 
 
 
 
 

Welcome Guest ( Log In | Register )

 

Entry 

entry Apr 10 2006, 10:16 AM
Today, 04/09/06, I cleaned up the welds, remounted the prop valve, rebent brake lines, found the problem with the shifting (clutch tube broke away..fixed it), re-engineered the wiring loom and found rust.

To protect the wiring loom passing thru the engine shelf (new hole drilled), I use 3/4" heater hose, split and wrapped around wires. I extended down to cover the original boot in hopes of keeping some water out.

Now, I need to cut the holes for the oil tank and begin the 5 lug conversion.

Attached thumbnail(s)
Attached Image Attached Image Attached Image Attached Image Attached Image Attached Image Attached Image Attached Image

 
« Next Oldest · My Blog · Next Newest »