OT: Roof framing, alteration |
|
Porsche, and the Porsche crest are registered trademarks of Dr. Ing. h.c. F. Porsche AG.
This site is not affiliated with Porsche in any way. Its only purpose is to provide an online forum for car enthusiasts. All other trademarks are property of their respective owners. |
|
OT: Roof framing, alteration |
thomasotten |
Dec 10 2007, 02:06 PM
Post
#1
|
Senior Member Group: Members Posts: 1,556 Joined: 16-November 03 From: San Antonio, Texas Member No.: 1,349 |
I have an existing roof on my house that is pitched and creates a cathedral type ceiling underneath. I am considering increasing the pitch of this roof, for ascthetic reasons mostly, but also to add insulation to the roof, which I don't thick is adequetly insulated. There is no attic space right now, so I cant' be sure of the insulation, although it gets hot in summer time. I want the final roof to be 12/12, and to do this, I would need to raise the ridge by about 2'. From the ridge, I would then run rafters down to the bottom of the roof fascia. Instead of raising each rafter up and causing a mess, I am considering building a structure over the exsiting roof, and then sheathing over. That way I don't disturb the ceiling. I was thinking of also doing this in phases, keeping the existing shingles on as a I go. What do you think?
|
rhodyguy |
Dec 21 2007, 11:46 AM
Post
#2
|
Chimp Sanctuary NW. Check it out. Group: Members Posts: 22,193 Joined: 2-March 03 From: Orion's Bell. The BELL! Member No.: 378 Region Association: Galt's Gulch |
if you go the the insulated panel route, ensure you use a closed cell product.
personal liability is a factor to consider when assembling a crew and acting as a 'private contractor'. someone takes a header off the roof, it could cost you dearly. even so much as a "i hurt my back" could become a nightmare. get bids from licenced and bonded contractors. ask for past customers and get feedback. a good contractor should be more than happy to provide this info. ask the usual ?. was the work completed in a timely fashion? was the yard a pig sty when the job was finished? when we did our roof (2 layers of comp), the contractor showed up with a scissor lift bed truck for hauling away the waste. a tear off crew of 8 or so and it was stripped and papered in 1 day. next day, 2 roofers and the shingling was done in 2 days. after all was said and done there was not so much as a piece trash in the flower beds. k |